FINE VIEW ENGINEERING LTD |
 |
 |
|
 |
Construction Of Civil Engineering Works - Waterworks,Roads & Drainage,Site Formation |
Oct 99 - Dec 99 |
Trade: |
Site Formation |
Installation of Soil Nails, Spraying |
Client: |
Mr. Chu Shing-kwok |
Shocrete, Construction of Mass Concrete |
Contract Amount: |
0.4 M |
Wall and Drainage Works |
|
|
Lot 277 R.P. & 278 S.A., D.D. 214, |
|
|
Nam Wai, Sai Kung, NT |
Contract Amount: |
0.45 M |
|
Oct 99 - Dec 99 |
Trade: |
Site Formation |
Proposed Chapel at |
Client: |
The Church of Jesus Christ of |
Tseung Kwam O, No. 45, Area 11 |
|
Latter-Day Saints Hong Kong Ltd |
|
Contract Amount: |
1 M |
|
Oct 99 - Jan 00 |
Trade: |
Site Formation |
Installation of Soil Nails, Spraying |
Client: |
Mr. Chu Shing-kwok |
Shocrete Construction of Mass |
|
|
Concrete Wall and Drainage Works |
Contract Amount: |
0.4 M |
Lot 277R.P. & 278 S.A. D.D. 214, |
|
|
Nam Wai, Sai Kung, NT |
|
|
|
Dec 99 - Apr 00 |
Trade: |
Site Formation |
Slop Stabilization Works for Soil Nails |
Client: |
Mr. Ying-ming Yau |
D.D. 214, No. 996 Nam Wai Road, |
|
|
Sai Kung, NT |
Contract Amount: |
0.3 M |
|
Oct 92 - Apr 93 |
Trade: |
Site Formation |
Remedial Works of Collapsed Slope |
Engineer: |
Furgo (HK) Ltd |
Kai Kung Shan, Borrow Area, NT |
Contract Amount: |
4 M |
Road Construction & Renovation Works
for Shek Kwu Chau Treatment & Rehabilitation Centre (SARDA) Shek Kwu Chau, Cheung Chau |
 |
 |
New insulated aluminum roofing panels |
Construction of new concrete road |
 |
 |
Preparation works for replacement of new roofing |
Construction of new concrete road |
|
Piping Replacement Work |
for Neich Tower |
|
128 Gloucester Road, Wanchai, HK |
|
Client: Jones Lang LaSalle |
|
 |
 |
 |
|
|
Condition before works |
 |
 |
 |
Set up of Bamboo Scaffolding |
Water Pressure Test |
New uPVC Pipings in Place |
|
|
Replacement of Watermains |
Fairview Park, Yuen Long, New Territories Phase |
Phase 1 (2001-2002) Phase 2 (2004-2006) |
 |
 |
Trapping Tee Connection |
Pipe Connection by Electrofusion |
The contract include the replacement of existing cast iron watermains with MDPE PIPE with electrofusion technology.The total length of watermains to be replaced is over 37 KM with total no. of house units over 5,000. |
 |
 |
Less Excavated Area for Trenchless Excavation |
'Vermeer' Horizontal Drilling Machine |
|
|
 |
 |